LFR stripped the existing waterproofing and insulation back to the concrete substrate/deck and installed a full Built-up Bauder waterproofing system including insulated & encapsulated parapets and a flatboard insulation scheme to meet building regulation part ‘L’ requirements.
Box gutter channels were needed to feed water from one area (Waffle) to the next with lead chutes that were tailor made on-site.